Inhaltstyp
Kategorien
-
IEA HPT Annex 63
- /en/research-topics/digitalisation-and-hvac-technologies/projects/iea-hpt-annex-63
* Nachricht * Send DI Dr. Christoph Reichl +43(0) 50550-6605 +43(0) 50550-6679 christoph.reichl(at)ait.ac.at KEY DATA Project start: 01/23 Projektdauer: 36 Months Project partner: Österreichische Akademie
-
Sustainable & flexible Manufacturing Systems
- /en/solutions/sustainable-flexible-manufacturing-systems
Glück Head of Competence Unit Complex Dynamical Systems Center VAC +43 664 88256087 tobias.glueck(at)ait.ac.at × Kontakt Formular Pflichtfelder sind mit einem * markiert. Name * E-Mail * Betreff * Nachricht [...] Senior Research Engineer Complex Dynamical Systems Center VAC +43 664 88256031 martin.niederer(at)ait.ac.at To the Center for Vision, Automation & Control To the Research Groups High-Performance Vision
-
ERIGrid - Connecting European Smart Grid Infrastructure
- /en/research-topics/power-system-digitalisation/projects/erigrid-connecting-european-smart-grid-infrastructure
number of distributed energy sources and generators into our energy system. Under the leadership of AIT, 18 of Europe’s top research institutions have joined forces in order to pool together their know-how [...] 18 European research institutions from across 11different countries, and under the leadership of AIT, have joined forces in the transnational ERIGrid project (European Research Infrastructure supporting [...] industrial enterprises, system operators and standardisation institutions," explains Thomas Strasser of AIT. This unique pan-European research infrastructure will be supplemented by the provision of optimised
-
Sponge - Smart Grids Rapid Prototyping
- /en/research-topics/power-electronics-system-components/projects/sponge-smart-grids-rapid-prototyping
Research Engineer / Electric Energy Systems +43 (0) 50 550-6032 +43 (0) 50 550-6390 johannes.stoeckl(at)ait.ac.at
-
Sinergy
- /en/research-topics/power-electronics-system-components/projects/sinergy
competitiveness. Projektpartner Institute Mihajlo Pupin – IMP (Serbia) Austrian Institute of Technology - AIT (Austria) National University of Ireland, Galway - NUIG (Ireland). Funding Tool H2020-EU.4.b. - Twinning [...] Research Engineer / Electric Energy Systems +43 (0) 50 550-6032 +43 (0) 50 550-6390 johannes.stoeckl(at)ait.ac.at Key Facts Project start: January 2021 Project duration: 36 months Project website: project-sinergy
-
Performance+ - PV System Optimisation
- /en/research-topics/power-electronics-system-components/projects/performance-pv-system-optimisation
Research Engineer / Electric Energy Systems +43 (0) 50 550-6032 +43 (0) 50 550-6390 johannes.stoeckl(at)ait.ac.at Publications published:F. Andren, R. Bründlinger, T. Strasser: "IEC 61850/61499 Control of D
-
HyFleet
- /en/research-topics/power-electronics-system-components/projects/hyfleet
production of green hydrogen. AIT develops DCDC converters to connect the fuel cell to the DC-link for batteries and drives. Project partner BRP-Rotax GmbH & Co KG (Lead), AIT Austrian Institute of Technology [...] Research Engineer / Electric Energy Systems +43 (0) 50 550-6032 +43 (0) 50 550-6390 johannes.stoeckl(at)ait.ac.at Key Facts Project Start : April 2021 Projektduration: 48 months
-
Cotevos - Developing Capacities for Interoperability Asse
- /en/research-topics/power-electronics-system-components/projects/cotevos-developing-capacities-for-interoperability-asse
Research Engineer / Electric Energy Systems +43 (0) 50 550-6032 +43 (0) 50 550-6390 johannes.stoeckl(at)ait.ac.at Publications M Nöhrer, F. Lehfuss, J. Stöckl: "Flexible Test System Architecture for Electric
-
ABS4TSO
- /en/research-topics/power-electronics-system-components/projects/abs4tso
Anta , PhD Senior researcher / Electric Energy Systems +43 50550 6031 +43 50550 6390 adolfo.anta(at)ait.ac.at
-
FELDBATT
- /en/research-topics/hybrid-power-plants/projects/feldbatt
Steiermark Technik GmbH Energienetze Steiermark 4ward Energy Research GmbH Sprecher Automation GmbH AIT Austrian Institute of Technology GmbH × Kontakt Formular Pflichtfelder sind mit einem * markiert. Name [...] Research Engineer / Electric Energy Systems +43 (0) 50 550-6027 +43 (0) 50 550-6390 johannes.kathan(at)ait.ac.at
-
ABS4TSO
- /en/research-topics/hybrid-power-plants/projects/abs4tso
Anta , PhD Senior researcher / Electric Energy Systems +43 50550 6031 +43 50550 6390 adolfo.anta(at)ait.ac.at
-
BatterieSTABIL
- /en/research-topics/hybrid-power-plants/projects/batteriestabil
Research Engineer / Electric Energy Systems +43 (0) 50 550-6027 +43 (0) 50 550-6390 johannes.kathan(at)ait.ac.at
-
StoreITup-IF
- /en/research-topics/efficiency-in-industrial-processes-systems/projects/storeitup-if
potentials will be identified. Project start: April 2015 Project duration: 36 months Project partners: AIT Austrian Institute of Technology GmbH (Lead), FH Oberösterreich, CTB Automatisierungstechnik GmbH, [...] Kunststofftechnik, technosert electronic GmbH Funding line: 1st Call, Energy Research Program, 2014 AIT contact: Christoph Zauner Links to Publications Final report (German) http://dx.doi.org/10.1016/j.apenergy [...] Engineer / Sustainable Thermal Energy Systems +43 (0) 50 550-6381 +43 (0) 50 550-6390 christoph.zauner(at)ait.ac.at
-
DryFiciency
- /en/research-topics/efficiency-in-industrial-processes-systems/projects/dryficiency
and carbon emissions. Project start: September 2016 Project duration: 60 months Project partners AIT Austrian Institute of Technology GmbH (Lead), Agrana Stärke GmbH (AT), Wienerberger AG (AT), RTDS GmbH [...] Valorisation of waste heat in industrial systems (SPIRE PPP) Project website: http://www.dryficiency.eu AIT contact: Veronika Wilk, Senior Research Engineer × Kontakt Formular Pflichtfelder sind mit einem * [...] Veronika Wilk Senior Research Engineer, Thematische Koordinatorin +43 50550-6494 veronika.wilk(at)ait.ac.at
-
BAMBOO
- /en/research-topics/efficiency-in-industrial-processes-systems/projects/bamboo
http://bambooproject.eu AIT Contact: Franz Helminger × Kontakt Formular Pflichtfelder sind mit einem * markiert. Name * E-Mail * Betreff * Nachricht * Send DI (FH) Franz Helminger AIT Austrian Institute of [...] and three SMEs as technology providers, working with experienced RTOs. Within the BAMBOO framework, AIT is developing a heat pump steam generator that makes waste heat usable in the form of saturated steam [...] CIRCE Centro de Investigacion de Recursos y consumos energeticos (Spain) TU Braunschweig (Germany) AIT Austrian Institute of Technology GmbH (Austria) IKERLAN S Coop (Spain) CERTH (Ethniko Kentro Erevnas
-
Increase quality through optical inspection
- /en/blog/increase-quality-through-optical-inspection
whether or not it is a surface defect," explains Andreas Vrabl, head of the AIT Center for Vision, Automation & Control (VAC). © AIT Inline computational imaging methods can be used to visualize and measure [...] test objects," explains Markus Clabian, Head of Competence Unit High-Performance Vision Systems at AIT. © AIT/voestalpine Boehler Edelstahl A specially designed measuring head is used to scan the surface of [...] technology from AIT is also being used in electronics manufacturing, in the production of photovoltaic panels, in battery production or in packaging printing, among other applications. About the AIT Center for
-
metaTGA
- /en/research-topics/digitalisation-and-hvac-technologies/projects/metatga
Gerhard Zucker Senior Scientist / Sustainable Thermal Energy Systems +43 50550-6591 gerhard.zucker(at)ait.ac.at
-
DS4SSCC
- /en/themen/smart-and-carbon-neutral-urban-development/projekte/ds4sscc
Cities +43 664 88256111 +43 50550-6613 ghazal.etminan(at)ait.ac.at ECKDATEN Projektstart: Oktober 2022 Laufzeit: 12 Monate Projektpartner: AIT Austrian Institute of Technology GmbH OASC (Lead) Eurocities
-
AHEAD - Advanced Heat Pump Demonstrator
- /en/ahead
Veronika Wilk Senior Research Engineer, Thematische Koordinatorin +43 50550-6494 veronika.wilk(at)ait.ac.at Key data Project Duration: 12/22 – 11/25 Project volumen: € 1.335.975 Project partner: Takeda
-
Gasthermenersatz (gas boiler replacement)
- /en/research-topics/digitalisation-and-hvac-technologies/projects/gasthermenersatz
ly heating systems is perhaps the greatest challenge . To find a solution, Ochsner Heat Pumps and AIT - Austrian Institute of Technology are working on a joint project to develop a modular heat pump with [...] buildings with heat pumps is only at the beginning of its success story. Ochsner Wärmepumpen and AIT - Austrian Institute of Technology are working in a joint project on the development of cost-effective [...] * Nachricht * Send DI Dr. Christoph Reichl +43(0) 50550-6605 +43(0) 50550-6679 christoph.reichl(at)ait.ac.at Key data Project start: 01.10.2021 Project duration : 34 Monate Projekt partner: Ochsner Wärmepumpen