-
Assessment of your ecological balance sheet
- /en/solutions/plan/ecological-balance-sheet
BSc Tel +43(1) 313 04 5579 Spittelauer Lände 5, 1090 Wien holger.heinfellner(at)umweltbundesamt.at http://www.umweltbundesamt.at Information material (in German) Infoblatt Ökobilanzen pdf (1 MB)
-
MoSeS
- /en/solutions/reliable-transport-infrastructure/vibes/moses
Continuous frequency sweeps, white noise, fixed frequencies, variable sweep speed, frequency range 1-80 Hz Achievable excitation power Without mounting approx. 15 kN, with mounting max. 25 kN; frequency
-
SHEtech - Women in future jobs
Bundesministerin Leonore Gewessler, BA / BMK 17:45 Science Impulse zu Technology & Jobs: Impuls 1: KI vs. Fake News– Mina Schütz, MA, Dissertantin Impuls 2: Cybersicherheit von IT-Systemen – Dr. Maria [...] Stock & Order Systems, Porsche Informatik GmbH) 19:00 Interaktive Break-Out Sessions Break Out 1: How women innovate … Energy mit Michaela Leonhardt (OVE Fem) & Isabelle Reiter (Wiener Netze) Break
-
PV-SÜD
- /en/research-topics/acoustics-and-noise-abatement-in-the-transport-sector/projects/pv-sued
Center for Transport Technologies, "The PV roofing is intended to achieve the following objectives: (1) energy generation through photovoltaics using suitable PV module technology, (2) flexible use in the
-
INDUSTRIAL DIGITALISATION AND AUTOMATION
Since September 1, 2020 Tobias Glück has been head of the Competence Unit Complex Dynamical Systems (CDS) at the Center for Vision, Automation & Control. With his appointment, the AIT Austrian Institute
-
ERIGrid 2.0: 1st call for the use of 21 European Smart Grids Labs starts
and virtual access to the corresponding facilities. Start of the application for participation: On 1st October 2020 the first call for the use of 21 European Smart Grids and Smart Energy Systems laboratories
-
GROOVE
- /en/research-topics/road-condition-monitoring-assessments/projects/groove
surface properties of noise emission, skid resistance and evenness were monitored over a period of 1 to 1.5 years. The increase in skid resistance achieved by the grinding is no longer present at the end
-
Virtual symposium for assistance systems in production
event was held in virtual form, but this did not affect the experience of the visitors in any way. The 1st virtual "MMP" Symposium dealt with the following questions, among others: How can assistance systems
-
UNCOVER
- /en/about-the-ait/center/center-for-innovation-systems-policy/uncover
Coordination and Support Action: Supporting (CSA-SA) Work programme topics addressed: HEALTH.2011.4.1-2: Targeting publication bias Project number: 282574 UNCOVER is an FP7-funded project under Contract
-
IEEE Women in Engineering Award 2020
The paper: „Towards Identification of Incorrectly Segmented OCT Scans.” https://files.icg.tugraz.at/d/1c5817316c52458380fc/files/?p=/acvrw20_36.pdf Joint Austrian Computer Vision and Robotics Workshop (ACVRW)
-
LVZ 2018
- /en/research-topics/acoustics-and-noise-abatement-in-the-transport-sector/projects/lvz-2018
measurement campaign included statistical and controlled pass-by measurements according to ISO 11819-1 at seven locations with low-noise stone mastic asphalt pavements with a maximum aggregate size of 11
-
4GAMECHANGERS TV: Alexandra Millonig im Gespräch
In „4GAMECHANGERS TV-Der Talk“, ausgestrahlt auf Puls 4 und Kabel 1, spricht Isabella Richtar mit AIT-Mobilitätsforscherin Alexandra Millonig unter anderem über menschliches Mobilitätsverhalten, auto
-
CoDeC
- /en/codec
The developers called this approach “cognitive design computing”. The primary project tasks are to: 1) achieve integrated planning; 2) plan with citizens and stakeholders; and 3) develop appropriate digital
-
SIMONA
- /en/research-topics/digital-resilient-cities/projects/simona
nal cooperation for joint DRB water management The system is a functional composition of sediment (1) sampling, (2) laboratory analysis, (3) evaluation protocols and (4) SIMONA-tool (online IT application)
-
CHEERS
- /en/research-topics/digital-resilient-cities/projects/cheers
governance and intervention programs. These goals are achieved through a holistic, multi-level approach: 1. Building a knowledge base to identify endangered cultural heritage 2. Establishment of reference c [...] co-financed by the European Regional Development Fund through the Interreg Alpine Space programme with 1.693.466,08 € × Kontakt Formular Pflichtfelder sind mit einem * markiert. Name * E-Mail * Betreff * Nachricht
-
Grid-connected inverters
- /en/solutions/power-system-technologies/grid-connected-inverters
EN 50549-1/2/10 VDE AR N 4105, VDE 0124-100 (Germany) VDE AR N 4110, FGW TR3 (Germany) VDE 0126-1-1 (Germany) OVE R 25 (Austria) IEC 62116 International test standards (IEC, UL 1741, IEEE 1547.1 etc.) available [...] 50549-1/2/10 defines the requirements for generation systems that are connected in parallel to distribution grids. In Germany, VDE AR N 4105, VDE 0124-100, VDE AR N 4110, FGW TR3 and VDE 0126-1-1 are decisive [...] prevent the formation of islands. International test standards, such as IEC, UL 1741 and IEEE 1547.1, are available through partnerships with global certification providers. In addition to the connection
-
Testing for EV Charging Infrastructure
- /en/solutions/power-system-technologies/grid-interoperability-and-conformance-testing-for-ev-charging-infrastructure
on protocols (e.g. IEC 61851, IEC 15118, OCPP) Testing of EVSE against national grid codes up to 1 MVA EV/EVSE connection to low voltage grid simulation Analysis of charging characteristics Intero
-
Battery Energy Storage System and (PV) inverter testing
- /en/solutions/power-system-technologies/battery-energy-storage-system-and-pv-inverter-testing
according to national and international standards: VDE AR N 4105, VDE 0124-100, VDE 0126-1-1, EN 50438, EN 50549-1/2, BDEW, FGW TR3, CEI0-21 & CEI0-16 Performance testing according to EN50530 & EN61683 [...] the AIT Smart EST laboratory Full emulation of AC grid, PV array, battery and load components up to 1 MW. On-Site testing at the customer side (e.g. for validation of the battery capacity against the
-
Efficiency Testing of PV Inverters and PV Storage Systems
- /en/solutions/power-system-technologies/efficiency-testing-of-pv-inverters-and-pv-storage-systems
error) AIT SmartEST Laboratory Testing Capabilites Battery Energy Storage Systems and PV inverters up to 1 MW Battery Energy Storage Systems for residential application up to 30 kW Testing of DC, AC and PV
-
15. A3PS Konferenz – Eco-Mobility 2020 – Virtual Live Event
führen. Datum: 19. November 2020 Veranstaltungsort: Virtuell & Tech Gate Vienna, Donau-City-Straße 1, 1220 Vienna, Austria Session 4 – Advanced Vehicle Concepts: “QUIET - QUalifying and Implementing a
Searched for "1'"".
Found 654 results in 15 milliseconds.
Displaying results 341 to 360 of 654.